Project Overview

The Admiral Colchester Project involved the transformation of a historic
commercial property located within a busy high street setting. During the
strip-out phase, the building was carefully taken back to its original fabric,
revealing a previously concealed historic timber-framed structure.

 

Project specifications

  • Historic building strip-out - the property was carefully stripped back to its original fabric, exposing a previously concealed timber-framed structure.
  • Structural stabilisation - practical structural solutions were developed to support the collapsing three-storey building.
  • Floor replacement - collapsing floors were removed and replaced using timber joists with concrete structural foundations.
  • Scheme redesign - the project was reworked to accommodate unforeseen structural requirements while protecting the overall development vision and commercial viability.
  • Mechanical & Electrical design - a complete M&E package was designed, coordinated and signed off in accordance with relevant regulatory requirements and British Standards.
  • Bespoke timber shopfront - Olli Construction developed the client-approved planning design through detailed design, manufacture and installation, with the completed works signed off by the Local Planning Authority.

Before
after

Despite the initial challenges of the structural stability, we were able to speak with the client to advise of the unforeseen changes to the plan and quickly provide a solution to keep the project delivered on time. The result of our hard work is shown through the massive difference from the condition of the building at the start, to the venue's new and modern look - Daniel James, Site Manager

Project Outcome

Despite the significant unforeseen structural challenges, the building was successfully stabilised and its historic fabric preserved, enabling the internal fit-out phase to proceed.

The revised scope required adjustments to both the construction programme and project budget. Through close coordination, clear communication and proactive problem-solving, the scheme was adapted while maintaining quality and compliance.

The interior fit-out was delivered to a high standard, meeting the client's expectations and operational requirements. The completed works achieved Building Control sign-off, and the arcade is now fully operational as a modern and engaging environment aligned with Admiral's vision.

The final result balances heritage conservation, structural integrity and commercial practicality. Despite the challenges encountered during delivery, the client considered the project an overall success in terms of execution, finish and final outcome.

Works Office & Depot
445 North Woolwich Road
London
E16 2DA

Tel: 020 7474 5111
Email: info@olliconstruction.co.uk

We work in partnership with

 see all our accreditations 
Privacy Policy